We installed casing and slurry displacement with tremied concrete placement and rock drilling with pre-blasting as approaches essential to completing the work.
View the embedded image gallery online at:
https://wilsonconst.com/services/foundation-services/item/60-nextera-buck-julian-hinds-230kv-ca#sigProId54698b670a
https://wilsonconst.com/services/foundation-services/item/60-nextera-buck-julian-hinds-230kv-ca#sigProId54698b670a
Wilson drilled 31 shaft footings that ranged from 3 feet to 9 feet in diameter and up to 60 feet deep during this extremely environmentally sensitive project that included a right-of-way with difficult-access areas.